Kohler Power Systems is pleased to announce that we are sponsoring a 60-minute webinar through CSE titled “Critical Power: Backup, Standby and Emergency Power for Hospitals” on Tuesday, February 2nd, 2021 at 2pm ET.
When designing backup, standby and emergency power systems for hospitals, there are several considerations beyond NFPA 70: National Electrical Code and other building code requirements that must be addressed. Electrical engineers must understand the specific owner project requirements for the building’s power systems and ensure that the generator specification and system topologies meet all those requirements for cost, construction schedule, component performance and system maintainability. Engineers also need to be mindful of the construction process, and ensure equipment replacement is coordinated, temporary power strategies are identified, and phasing concepts are developed.
No thanks
No thanks